Our Infrastructure

Asphalt plants, specialized machinery and transport fleet serving Tampico, Ciudad Madero, Altamira and Northern Veracruz.

Production

Asphalt Plants

Two asphalt plants with a combined production capacity of 280 tn/hr.

Tamos asphalt plant in Pánuco, Veracruz
Pánuco, Veracruz

Tamos Plant

Fixed plant located on Camino a Minera Autlán in Tamos, municipality of Pánuco, Veracruz.

Brand: Triaso — Model: ADM110
Production capacity: 110 tn/hr
Revuelta Scale ERCC1250VBB6 — 50,000 kg
CMC asphalt emulsion plant — 8,000 lts
John Deere 150 mkva and Kurz & Root 50 mkva generators
Current location: Ébano

Mobile Plant

Ideal plant for rental and medium-volume projects. Its mobility allows it to be transported directly to the job site.

Brand: CMC — Model: 2015
Production capacity: 60 tn/hr
Fully transportable to job site
Available for rental
Mobile asphalt plant
0
Production Capacity
0
Equipment Units
0
Equipment Categories
0
Up-to-Date Maintenance
Inventory

Machinery Fleet

Over 100 owned equipment units to guarantee the efficient execution of every project.

Asphalt paving equipment Paving Equipment

Profilers and Pavers

Specialized equipment for asphalt overlay paving and profiling.

  • 3 Profilers: CMI PR-500FL, Volvo MT-2000, Roadtec RX-600E
  • 6 Pavers: Blaw Knox, Roadtec RP-190, Barber Greene, Volvo P-7170, CAT AP-900B
  • 8 Tandem vibratory compactors: Dynapac, CAT, Ingersoll Rand, Hypac
Pneumatic rollers, sweepers and tack coat distributors Paving Equipment

Pneumatic Rollers, Sweepers and Tack Coat Distributors

Complementary equipment for asphalt overlay preparation and application.

  • 5 Pneumatic rollers: Ingram, Hyster, Ingersoll Rand PT-240R
  • 6 Sweepers: Waldon Sweep Master, Broce Broom, Rosco
  • 5 Tack coat distributors: 3,200 to 8,000 lts (Mercedes Benz, Ram, Kenworth, International)
Motor graders and compactors Earthworks

Motor Graders and Compactors

Heavy equipment for leveling, grading and compacting earthworks.

  • 6 CAT motor graders: 140-G, 120-H (4 units), 135H
  • 7 Earthwork vibratory compactors: Ammann ASC-100, Hamm 3410P (2), Hyster, Ingersoll Rand, Bomag
Backhoe loaders and excavators Earthworks

Backhoe Loaders and Excavators

Large fleet for excavation, loading and material handling.

  • 9 Backhoe loaders: Case 580 (6 units), John Deere 310 (2), CAT 416E
  • 4 CAT Excavators: 321D, 320D, 320, 320E
  • 1 CAT 950-B Wheel Loader
  • 5 Water tankers: up to 10,000 lts (Ford, Famsa, International)
Asphalt equipment Asphalt

Asphalt Production Equipment

Plants, spreaders and auxiliary equipment for asphalt mix production and application.

  • 3 Asphalt plants: 2 Triaso 110 tn/hr + 1 CMC Mobile 60 tn/hr
  • 2 Synchronized pre-mixed seal spreaders
  • CMC asphalt emulsion plant — 8,000 lts
  • Revuelta scale 50,000 kg, generators and light towers
Road marking equipment Road Marking

Road Marking Equipment

Line painting machines and equipment for horizontal and vertical road marking.

  • Swega 970 (chlorinated rubber) and 1301-TP (thermoplastic) line painters
  • Graco RoadLazer and 3400 (manual) line painters
  • Boilers for thermoplastic paint with cart
Heavy transport fleet Transport Fleet

Transport Fleet

Heavy transport vehicles for hauling materials, machinery and asphalt.

  • Lowboys: 50 tn (3 axles) and Natsa 15 tn flatbed
  • Dump trucks: Ford, Dina, International, Volvo (14 tn)
  • Tractors: International, Kenworth, Freightliner DD16 2025
  • 2 IARSA gondolas 30m³ 2025 + IARSA Dolly
  • Trailer tanks: up to 45,000 lts
Track Record

Project History

A selection of contracts and projects executed from 2019 to date.

2025

Nov 2025
Government of the State of Tamaulipas

Rehabilitation of hydraulic pavement on PD (Perimetral Duport) road between Jacarandas street and IMSS Clinic No. 16, Monte Alto area, Altamira (Stage 2).

Sep 2025
H+D Inversiones y Proyectos

Civil works for the construction of the Multidisciplinary Comprehensive Complex of Altamira (CIMA), Second Stage.

Jul 2025
H+D Inversiones y Proyectos

Urban development, infrastructure and facilities of "21 de Marzo" subdivision, Altamira: pavements, drainage, potable water, electrification, street lighting and residential platforms.

Jun 2025
State Government / Municipality of Altamira

Rehabilitation of accesses to vehicular bridge at km. 30+860 on federal highway No. 80, Altamira. Hydraulic concrete paving in col. Nuevo Madero, Altamira.

May 2025
Municipality of Tampico

Asphalt resurfacing on various streets in the Downtown area including deep pothole repair and road marking.

Mar 2025
Municipality of Tampico / Cd. Madero

Asphalt concrete milling. Resurfacing of Av. Álvaro Obregón between Av. Monterrey and Melchor Ocampo (Stages 2 and 3), Cd. Madero.

Feb 2025
Constructora Croswell

Earthworks and demolitions for construction of Super Chedraui Altamira.

Jan 2025
Municipality of Cd. Madero

Asphalt concrete resurfacing of Boulevard Adolfo López Mateos between Av. Ejército Mexicano and calle 16 de Septiembre.

2024

Dec 2024
Municipality of Cd. Madero / Altamira

Asphalt milling EKBE SUPERPAVE PG 64-22. Hydraulic concrete paving in col. Nuevo Madero, Altamira.

Jul-Aug 2024
Municipality of Tampico / Altamira / Cd. Madero

Resurfacing of Av. Hidalgo, Tampico. Overlay on C-16 street Altamira. Construction of vehicular bridge on Camino al Repecho. Paving of multiple streets in Cd. Madero (6 works). Bike lane 2.34 km on Blvd. Paseo Noche Buena. Rehabilitation of "Los Panchos" park.

Feb-May 2024
Altamira / Tampico / CAPUFE / Cd. Madero

Asphalt resurfacing in multiple neighborhoods of Altamira. Curbs and sidewalks on Blvd. Paseo Noche Buena. Resurfacing of Matamoros street, Tampico. Maintenance of Western Bypass Tampico (CAPUFE). Asphalt milling EKBE.

Jan 2024
COMAPA Altamira

Machinery rental: van, excavator, 10,000 lts water tanker, backhoe loader with hammer kit.

2023

Nov-Dec 2023
Municipality of Altamira

Hydraulic concrete paving on Plutarco Elías Calles street, col. Ganadera. Resurfacing in Fracc. Gema. Paving on Paseo Noche Buena street including vehicular bridge, Fracc. Alejandro Briones.

Mar-Apr 2023
Municipality of Tampico / Altamira

Paving on Av. Monterrey section to Congregación El Repecho (Second stage). Resurfacing on Río Tamesí street, col. Sierra Morena.

Feb 2023
S.C.T. Tamaulipas

Routine maintenance of 316.55 km on routes 80, 81 and 85 of the federal toll-free road network, state of Tamaulipas.

Jan 2023
Municipality of Altamira

Construction of roofing structures in various elementary schools in the municipality of Altamira.

2022

Oct-Dec 2022
Municipality of Tampico / State Government

Re-leveling of Av. Hidalgo. Residential construction 1,100 m² in Lomas de Miralta. Potable water line of 24" and 20" in hydraulic PVC (9.1 km), Altamira.

May-Aug 2022
Tampico / Altamira / Cd. Madero / State Government / SCT

Completion of Laguna del Carpintero road. Paving in Altamira. Deep pothole repair on Av. Hidalgo. Hydro-sanitary rehabilitation in Cd. Madero. Highway maintenance Cd. Victoria-Matamoros (9 km). Asphalt milling EKBE. Federal road network maintenance (21 km).

2021

Sep-Dec 2021
Municipality of Altamira / State Government

Resurfacing on Av. de la Industria, Altamira. Complementary works for livestock area at fairgrounds, Tampico. Construction of road at Laguna del Carpintero.

Jan-Aug 2021
Tampico / Cd. Madero / Altamira / SCT

Asphalt overlay at transfer station. Paving of Av. Miramar, Altamira. Paving of multiple streets in Cd. Madero (6 works col. El Polvorín). Resurfacing of Av. Hidalgo underpass. Asphalt milling EKBE. Routine maintenance of 158 km federal road network. Asphalt overlay on 12 km Nautla-Cardel section, Veracruz.

2020

2020
Tampico / Ergon Asfaltos / Cd. Madero / SCT

Tampico asphalt storage terminal (Ergon). Paving in Aldama (6.8 km). Private paving Volantín, Tampico. Milling and asphalt overlay paving. Highway rehabilitation Tampico-Cd. Victoria section Cuauhtémoc-Altamira. Paving of multiple streets in Fracc. Las Arboledas, Cd. Madero.

2019

2019
Desarrollo y Construcciones Urbanas / Cd. Madero

Rehabilitation of Tampico-Cd. Victoria highway section Cuauhtémoc-Altamira (multiple segments: paving, marking, drainage works). Rehabilitation of road junctions. Renovation of SRE offices in Cd. Madero. Asphalt milling EKBE. Rehabilitation of street in Tempoal, Veracruz.

Do you need machinery or asphalt mix?

We have the infrastructure to execute your project. We also offer mobile plant rental and asphalt milling services.